Belvidere Gym Floor Replacement *

Scope of Work:

Install new athletic floor.

 

Project Description:

The existing gymnasium floor at Belvidere

Elementary School was painted concrete.

As a pilot program for the District, a new

6.5mm athletic flooring system was

installed over the existing concrete. The

impact of the new floor improved the

overall quality of the existing gymnasium

by enhancing aesthetics and acoustics

while providing a much safer and

user-friendly gymnasium for kids and

adults.

 

Construction Cost:

$50,000

 

Year Completed:

2013

 