GHS Science Classroom Remodels: 2011, 2012 & 2013*

Scope of Work:

Provide modern science classroom

facilites to replace outdated facilities.

 

Project Description:

The program for each of the summer

projects included a lecture area, lab area,

prep room and chemical storage room.

Each lab area is equipped with student

workstations, emergency eye wash and

showers, equipment storage and general

laboratory storage areas. Casework is

provided throughout and around the

perimeter of the lecture and laboratory

areas.

The design takes into consideration the

separation of the two distinctive areas

physically and visually. The instructor’s

demonstration table is central to the entire

space allowing demonstration from either

side to accommodate the lecture or the

lab portion of the class. Student are

required to put on lab coats and protective

eye wear before crossing the bold yellow

stripe in the floor that signifies the

separation between the lab and lecture

areas. All aspects of these classrooms

have been designed to meet the A.D.A.

standards.

 

Construction Cost:

$230,000 to $350,000 per classroom

 

Year Completed:

2011, 2012 & 2013

*Completed while employed by others