Industrial Warehouse - Roof Structure Modifications*

 

 

 

Scope of Work:

Design new roof structure to eliminate existing valley between in a double-gable roof structure.

 

Project Description:

The structural engineer for the project designed an independent structural system to create a high ridge that eliminated the valley created by the original double-gable roof structure. This design saved the two existing 36,000 square foot warehouses from demolition.

 

The buildings were re-roofed with standing seam metal roofing panels.

 

 

Construction Cost:

undisclosed

 

Year Completed:

2011

 